Rainier Beach High School Replacement_BP01_Aggregate Piers
Status
Bidding Closed
Bid Date12/21/21 11:30am
Company & Contacts
UnitedPSD
Customer Services 206-382-1177 Ext 214
Location
8815 Seward Park AVE S, Seattle, WA 98118
Subcontractor shall control dust and fumes generated by their equipment and/or their work methods. Dust control shall include spraying soil and debris with water so as to control the generation of dust but not to cause ponding or water migration out of Subcontractor’s work area or damage to adjacent buildings/structures. Fume control shall include the use of exhaust scrubbers or exhaust snorkels. If
these fume control methods do not adequately control the fumes, then non-exhaust generating equipment shall be utilized. Subcontractors shall not idle equipment near any building air intakes.