Rainier Beach High School_ Bid Package 10 Earthwork & Utilities

Rainier Beach High School Replacement Subcontractor Bidding Schedule Bid Package 10 – SAMPLE Due 07/19/22 @ 10AM In accordance with RCW 39.10.380, Contractor (General Contractor/ Construction Manager) is requesting sealed proposals from contractors for the above referenced scopes of work. The project is to complete Rainier Beach High School Replacement – RBHS Bids will be accepted prior to the dates and times listed above for each bid package, at the offices of GC/CM, 3180 139th Ave. SE, Suite110, Bellevue Washington 98005, except as noted below. Proposals received after the time noted above will not be considered. Bids will be publicly opened and read aloud. The GC/CM and Owner reserve the right to reject any or all bids and to waive any informalities or irregularities on the bids received. Scope: Rainier Beach High School project will be a new multi-story high school of approximately 300,000 sq. ft., to provide permanent space for up to 1,600 students in grades 9-12. The existing school to be demolished is approximately 188,000 sq. ft. Roughly 750 students/staff will remain on-site during the period of construction. Construction is anticipated to begin in July 2022, be multi-phased and substantially complete by May 2025.
Date Company Contact
1656431453
6/28/22 8:50 am
Lydig Construction 3180 139th Ave SE
Bellevue, WA 98005
Patrick McGlothlin
Senior Project Manager
Tel: (425) 885-3314
1656353225
6/27/22 11:07 am
Seattle School Dist. #1 2445 3rd Ave South
Seattle, WA 98034-1165
Mike Skutack
Project Manager
Tel: 206-252-0669